AIDAluna
Key Particulars
Gross Tonnage: 69203
Net Tonnage: 42705
Displacement: -
Deadweight: 8654.40
Designer: Partner Ship Design (general arrangement and interior design of passenger spaces)
ASB (squash court)
Classification: GL 100 A5 ERS IW MC AUT EP-D RP3-50%
Length: 251.89m oa; 226.70m load; 226.55m pp
Breadth: 37.60m ext; 32.20m moulded
Draught: 7.30m actual; 7.20m design
Air draught: -
Depth: 9.60m moulded
Decks: 16 overall, 12 continuous, 11 passenger
Complement: 2716 (2082 pax dbl occ, 634 crew); 4802 (2168 pax max occ, 634 crew)
Cabins: 1041 (359 inboard, 682 outboard)
Yard Data
Meyer Werft GmbH S.660
Godmother: Franziska Knuppe
Operating Data
Owner: Costa Crociere S.p.A.
Manager: Carnival Maritime GmbH
Registry: Genoa, Italy
IMO: 9334868
MMSI: 247 255 400
Call Sign: ICLP
Timeline
1 October 2004 Contract signed between Meyer Werft and AIDA Cruses for two new "Project
Sphinx" cruise ships, to be completed in 2007 and 2009, respectively.
AIDAluna was to follow AIDAdiva as the second of these ships.
26 May 2005 Keel laid for Meyer Werft newbuilding 660.
6 October 2008 Float out of S.660 from the building dock.
16 March 2009 Meyer Werft completes S.660 for AIDA Cruises, at a total cost of US $390 million.
She is the first AIDA ship with an open-air cinema, with a 7.17m x 4.03m LED
sceen which contains over 186000 individual LED lights.
22 March 2009 Start of maiden voyage from Hamburg, Germany, to Palma de Mallorca, Spain.
4 April 2009 Christening of AIDAluna by German model Franziska Knuppe.
3 April 2019 Start of first refit, which involved a general refresh of her public rooms and the
addition of an Alpine lodge-themed eatery. On the technical side, she was
fitted with equipment to enable her to go "cold iron" in port.
16 April 2019 End of first refit.
Engineering Notes
Machinery:
4 Caterpillar MaK 9M43C
Propulsion devices:
2 Siemens 1DM5650-8DS06-Z
2 fixed-pitch propellers (130 rpm)
Speed (service/max): 19.50 / 21.80
Bow thrusters:
2 Brunvoll (2300kW ea.)
Stern thrusters:
2 Brunvoll (1500kW ea.)
Boilers:
2 oil-fired steam boilers (10bar, 107.00m2 ea.)
2 exhaust gas-heated steam boilers (10bar, 190.00m2 ea.)
Generators:
4 propulsion generator sets (12000kVA ea.)
Emergency generators:
1 diesel generator set (1000kVA)
Electric installations:
1 11000V (48000kVA)
1 690V (1000kVA)
Compressed air receivers:
2 receivers (30bar, 3000 liters ea.)
2 receivers (10bar, 1500 liters ea.)
Safety Notes
Lifesaving equipment:
10 lifeboats
6 tenders
2 rescue boats
Watertight bulkheads: 17