AIDAvita

Key Particulars

Gross Tonnage: 42289

Net Tonnage: 20877

Displacement: -

Deadweight: 4232

Designer: -

Classification: GL 100 A5 ERS IW MC AUT RP-50%

Length: 202.85m oa; 180.49m load; 179.74m pp

Breadth: 35.50m ext; 28.10m moulded

Draught: 6.30m

Air draught: -

Depth: 8.75m moulded

Decks: 10 passenger; 9 continuous

Complement: 1692 (1266 pax dbl occ, 426 crew); 1726 (1300 pax max occ, 426 crew)

Cabins: 633 (214 inboard, 419 outboard)

Yard Data

Aker MTW Werft GmbH 003

Godmother: Doris Schroder-Kopf

Operating Data

Owner: Costa Crociere S.p.A.

Manager: Carnival Maritime GmbH

Registry: Genoa, Italy

IMO: 9221554

MMSI: 247 114 900

Call Sign: IBNP

Timeline

29 September 1999 Contract signed between Aker MTW Werft and AIDA Cruises for the construction

of two new cruise ships, AIDAvita and AIDAaura.

21 November 2000 Keel laid for Aker MTW Werft 003 at their yard in Wismar, Germany.

15 November 2001 Float out of the dry dock and moved to the fitting out berth.

30 April 2002 AIDAvita is completed at a total cost of US $350 million.

early November 2014 AIDAvita undergoes her first refit, adding an exhaust gas scrubber system (AIDA's

third ship to be fitted with one) as well as passenger space enhancements.

These included the addition of two lounges on deck 10, a new and larger

sports area with new equipment, and a new spa reception area.

25 March 2017 Start of second refit at Lloyd Werft GmbH in Bremerhaven, Germany.  This

refit served to redecorate and refresh the ship, which was beginning to look

a bit dated.

4 April 2017 End of second refit

Engineering Notes

Machinery:

4 Wartsila diesel generators

1 diesel emergency generator set (680kVA)

Propulsion devices:

2 AMZ 1600 YX 14 Type

2 fixed-pitch propellers (162 rpm)

Speed (service/max): 19.00 / 21.00
Bow thrusters:

2 KaMeWa variable-pitch (1200kW ea.)

Stern thrusters:

2 KaMeWa variable-pitch (700kW ea.)

Boilers:

2 oil-fired steam boilers (10bar, 125.00m2 ea.)

2 exhaust gas-heated steam boilers (10bar, 81.00m2 ea.)

2 exhaust gas-heated steam boilers (10bar, 143.00m2 ea.)

Electric installations:

2 propulsion generators (11133kVA ea.)

1 6600/440 V (5224kVA)

1 6600/440 V (7427kVA)

1 6600 V (22266kVA)

1 440 V (680kVA)

Compressed Air Receivers:

2 receivers (30bar, 2000 liters ea.)

2 receivers (8bar, 500 liters ea.)

Bunkers: 1259m3

Ballast: 1674m3

Safety Notes

Lifesaving equipment:

6 lifeboats

4 tenders