Royal Princess
Key Particulars
Gross Tonnage: 142714
Net Tonnage: -
Displacement: 71300 load; 68155 design
Deadweight: 13000 load; 9855 design
Designer: Meyer Werft (overall)
Classification: LR + 100A1, +LMC with CCS notation IWS
Length: 330.00m / 1082.68ft oa; 306.00m / 1003.94ft pp
Breadth: 47.30m / 155.18ft ext; 38.40m / 125.98ft mld
Draught: 8.55m / 28.05ft load; 8.30m / 27.23ft design
Air draught: 60.70m / 199.15ft load
Depth: 21.00m / 68.90ft mld
Decks: 19 (14 passenger)
Complement: 5560 (3560 pax dbl occ, 2000 crew); 6200 (4200 pax max occ, 2000 crew)
Cabins: 1780 (342 inboard, 1438 outboard)
Yard Data
Fincantieri Monfalcone 6223
Timeline
10 April 2010
Fincantieri S.p.A. and Princess Cruises sign a contract to build yard number 6223, the first in a new class of cruise ships, the largest built by the yard to date.
14 December 2010
Steel cutting ceremony for Fincantieri yard number 6223.
20 October 2011
The first block of 6223 is laid down in a drydock in Fincantieri's Monfalcone shipyard in Italy.
31 July 2012
Royal Princess is floated out of the drydock and moved to the fitting out berth.
1 May 2013
Princess Cruises takes delivery of Royal Princess from Fincantieri S.p.A. The ship is valued at $735,000,000.
13 June 2013
The Duchess of Cambridge christens the new flagship of the Princess Cruises fleet.
16 June 2013
Royal Princess sets sail on her maiden voyage.